| 86 |
Life Safety Code |
February 23, 2011 |
| 85 |
Rotating Equipement Reliability |
February 10-11, 2011 |
| 84 |
Centrifugal and Reciprocating Compressors |
October 28, 2010 |
| 83 |
Safety Instrumented Systems |
October 20-21, 2010 |
| 82 |
Project Management - Managing Multiple Small Projects |
October 8, 2010 |
| 81 |
Fatigue Risk Management Systems (FRMS) - Managing Shiftwork in Control Room Environments |
August 12, 2010 |
| 80 |
Electrical Engineering for Non-Electrical Engineers |
June 17, 2010 |
| 79 |
Application of Wireless Instrumentation within Industrial Settings |
June 2, 2010 |
| 78 |
Pressure Relief System Design |
December 11, 2009 |
| 77 |
Control Valve Sizing and Selection |
November 5, 2009 |
| 76 |
Heat Transfer / Combustion Fundamentals with Applications |
September 16, 2009 |
| 75 |
Pump Selection and Operation |
August 26 - 27, 2009 |
| 74 |
Vibration Analysis and Machine Fault Diagnostics |
July 14, 2009 |
| 73 |
Process Troubleshooting |
February 2 - 4, 2009 |
| 72 |
Electrical Engineering for non-Electrical Engineers |
January 8, 2009 |
| 71 |
Flow Measurement Technologies |
October 2 - 3, 2008 |
| 70 |
Fired Process Heaters |
September 23 - 25, 2008 |
| 69 |
Advanced Project Management |
April 8 - 10, 2008 |
| 68 |
ACI 318 Reinforced Concrete Design |
March 11 - 12, 2008 |
| 67 |
Process Troubleshooting |
February 11 - 13, 2008 |
| 66 |
Process Piping to ASME B31.3 - Design, Construction and Mechanical Integrity |
October 1 - 3, 2007 |
| 65 |
Process Troubleshooting |
September 11-13, 2007 |
| 64 |
Motor and Drive Applications |
August 29-30, 2007 |
| 63 |
SIS Operational Requirements |
May 15-16, 2007 |
| 62 |
Pressure Vessel Design and Analysis |
December 6-7, 2006 |
| 61 |
Control Valves |
Sept 13-14, 2005 |
| 60 |
Project Management |
August 30-31, 2005 |
| 59 |
Life Safety Code |
Dec 14-15, 2004 |
| 58 |
Compressor & Surge Control Technology |
Sept 30-Oct 1, 2004 |
| 57 |
Distillation |
August 24-25, 2004 |
| 56 |
Electrical Engineering for Non-EE's |
March 23, 2004 |
| 55 |
SIS Implementation & SIL Verification |
October 6-8, 2003 |
| 54 |
Pump Selection, Operation, Maintenance & Reliability |
Sept 22-23, 2003 |
| 53 |
Distillation |
April 8-9, 2003 |
| 52 |
Project Management |
Dec 17-18, 2002 |
| 51 |
Heat Exchangers |
Oct 22-23, 2002 |
| 50 |
Root Cause Failure Analysis/Enhanced Investigation |
June 4-5, 2002 |
| 49 |
Heater-Burner Optimization |
April 16-17, 2002 |
| 48 |
Cogeneration and Deregulation of the Electric Utility Industry in LA |
Nov 6 - 7, 2001 |
| 47 |
Integrating Reliability into Engineering Standards |
July 19, 2001 |
| 46 |
Damage Mechanisms / Non-Destructive Evaluation |
April 24-25, 2001 |
| 45 |
ANSI/ISA S84.01 Design, Evaluation, Reliability of Safety Instrumented Systems |
April 17-18, 2001 |
| 44 |
Fixed Equipment Reliability Workshop |
November 14, 2000 |
| 43 |
Centrifugal Pumps: Selection, Operation, & Maintenance |
Sept 27-29, 2000 |
| 42 |
Trends in Automation/Fieldbus Technology |
May 25, 2000 |
| 41 |
PMP Test Preparation Seminar |
Feb 28-29, 2000 |
| 40 |
Compressors: Selection, Operation & Maintenance |
Nov 30-Dec 1, 1999 |
| 39 |
Instrumentation Reliability & Maintenance |
Oct 12-13, 1999 |
| 38 |
Managing Multiple Small Projects/Project Estimation |
May 25-26, 1999 |
| 37 |
Reliability Workshop (Instrumentation) |
May 11, 1999 |
| 36 |
Equipment Reliability |
February 4-5, 1999 |
| 35 |
Reliability Workshop |
Nov 5, 1998 |
| 34 |
Heat Exchangers in the Process Industries (#2) |
Sept 29-30, 1998 |
| 33 |
Equipment Reliability (Soloman Associates on Steam) |
May 12, 1998 |
| 32 |
Refractory Design & Maintenance |
April 20-22, 1998 |
| 31 |
How to Get the Most From Your Distillation System (2) |
April 20-21, 1998 |
| 30 |
How to Get the Most From Your Distillation System (1) |
February 3-4, 1998 |
| 29 |
Design & Evaluation of Safety Shutdown Systems |
December 12, 1997 |
| 28 |
Liquid/Gas Flow Control & Measurement Devices |
Oct 21-23, 1997 |
| 27 |
Equipment Inspection for Mechanical Integrity |
May 28-31, 1997 |
| 26 |
Application of High Efficiency Motors & Variable Speed Drives |
April 22-23, 1997 |
| 25 |
Piping Design & Stress Analysis per ASME B 31.3 |
Sept 17-19, 1996 |
| 24 |
Guidelines for Safe Process Operations & Maintenance |
May 15-16, 1996 |
| 23 |
Economic Evaluation, Analysis & Project Management |
March 26-28, 1996 |
| 22 |
Chemical Engineering for Non-Chemical Engineers |
Oct 25-27, 1995 |
| 21 |
EPA's Risk Management Program |
Sept 25-28, 1995 |
| 20 |
Industrial Wastewater Treatment (#2) |
July 26-27, 1995 |
| 19 |
Process Equipment Integrity |
May 3-4, 1995 |
| 18 |
ISO 9000 Quality Assurance Standards |
Nov 17-18, 1994 |
| 17 |
Programmable Controller Applications |
Oct 17-19, 1994 |
| 16 |
Process Safety Management |
June 27-29, 1994 |
| 15 |
Pump Selection: Operation & Maintenance (#2) |
Feb 9-11, 1994 |
| 14 |
NACE Basic Corrosion Course |
Sept 15-17, 1993 |
| 13 |
Pressure Release Valves/Rupture Discs:Selection-Maintenance |
May 10-12, 1993 |
| 12 |
Machinery Vibration Analysis |
March 2-5, 1993 |
| 11 |
Distributed Process Control Systems (#2) |
Nov 18-20, 1992 |
| 10 |
Environmental Laws for Industry |
Sept 23-25, 1992 |
| 9 |
OSHA Process Safety: Compliance with 29 CFR 1910.119 |
April 29-May 1, 1992 |
| 8 |
Heat Exchangers in the Process Industry (#1) |
Feb 26-28, 1992 |
| 7 |
Process Simulation: Overview of Hysim |
Nov 7-8, 1991 |
| 6 |
Construction Project Management (From Owner's Viewpoint) |
Sept 25-27, 1991 |
| 5 |
Principles of Project Management |
May 1-3, 1991 |
| 4 |
Pump Selection, Operation & Maintenance (#1) |
Feb 25-27, 1991 |
| 3 |
Distributed Process Control Systems |
Nov 7-9, 1990 |
| 2 |
Project Management & Evaluation |
Sept 20-21, 1990 |
| 1 |
Industrial Wastewater Treatment for the 1990s |
May 3-4, 1990 |