|
College of Engineering and Engineering Technology
Lake Area Industries/McNeese Engineering Partnership
Workshop History
You can CLICK on the active links under the “Topic” column to view the flyer used to announce the workshop in a PDF format.
Number |
Topic |
Date |
67 |
Advanced Project Management |
|
66 |
ACI 318 Reinforced Concrete Design |
|
65 |
Process Troubleshooting |
|
64 |
Process Piping to ASME B31.3 - Design, Construction and Mechanical Integrity |
|
63 |
Process Troubleshooting |
|
62 |
Motor and Drive Applications |
|
61 |
SIS Operational Requirements |
|
60 |
Pressure Vessel Design and Analysis |
|
59 |
Control Valves |
|
|
58 |
Project Management |
August 30-31, 2005 |
|
57 |
Life Safety Code |
Dec 14-15, 2004 |
|
56 |
Compressor & Surge Control Technology |
Sept 30-Oct 1, 2004 |
|
55 |
Distillation |
August 24-25, 2004 |
|
54 |
Electrical Engineering for Non-EE’s |
March 23, 2004 |
|
53 |
SIS Implementation & SIL Verification |
October 6-8, 2003 |
|
52 |
Pump Selection, Operation, Maintenance &
Reliability |
Sept 22-23, 2003 |
|
51 |
Distillation |
April 8-9, 2003 |
|
50 |
Project Management |
Dec 17-18, 2002 |
|
49 |
Heat Exchangers |
Oct 22-23, 2002 |
|
48 |
Root Cause Failure Analysis/Enhanced Investigation |
June 4-5, 2002 |
|
47 |
Heater-Burner Optimization |
April 16-17, 2002 |
|
46 |
Cogeneration and Deregulation of the Electric
Utility Industry in LA |
Nov 6 – 7, 2001 |
|
45 |
Integrating Reliability into Engineering
Standards |
July 19, 2001 |
|
44 |
Damage Mechanisms / Non-Destructive Evaluation |
April 24–25, 2001 |
|
43 |
ANSI/ISA S84.01 Design, Evaluation, Reliability
of Safety Instrumented Systems |
April 17–18, 2001 |
|
42 |
Fixed Equipment Reliability Workshop |
November 14, 2000 |
|
41 |
Centrifugal Pumps: Selection, Operation, &
Maintenance |
Sept 27-29, 2000 |
|
40 |
Trends in Automation/Fieldbus Technology |
May 25, 2000 |
|
39 |
PMP Test Preparation Seminar |
Feb 28-29, 2000 |
|
38 |
Compressors: Selection, Operation & Maintenance |
Nov 30-Dec 1, 1999 |
|
37 |
Instrumentation Reliability & Maintenance |
Oct 12-13, 1999 |
|
36 |
Managing Multiple Small Projects/Project
Estimation |
May 25-26, 1999 |
|
35 |
Reliability Workshop (Instrumentation) |
May 11, 1999 |
|
34 |
Equipment Reliability |
February 4-5, 1999 |
|
33 |
Heat Exchangers in the Process Industries (#2) |
Sept 29-30, 1998 |
|
32 |
Equipment Reliability (Soloman Associates on
Steam) |
May 12, 1998 |
|
31 |
Refractory Design & Maintenance |
April 20-22, 1998 |
|
30 |
How to Get the Most From Your Distillation
System (2) |
April 20-21, 1998 |
|
29 |
How to Get the Most From Your Distillation
System (1) |
February 3-4, 1998 |
|
28 |
Design & Evaluation of Safety Shutdown Systems |
December 12, 1997 |
|
27 |
Liquid/Gas Flow Control & Measurement Devices
|
Oct 21-23, 1997 |
|
26 |
Equipment Inspection for Mechanical Integrity |
May 28-31, 1997 |
|
25 |
Application of High Efficiency Motors &
Variable Speed Drives |
April 22-23, 1997 |
|
24 |
Piping Design & Stress Analysis per ASME B 31.3 |
Sept 17-19, 1996 |
|
23 |
Guidelines for Safe Process Operations &
Maintenance |
May 15-16, 1996 |
|
22 |
Economic Evaluation, Analysis & Project
Management |
March 26-28, 1996 |
|
21 |
Chemical Engineering for Non-Chemical Engineers |
Oct 25-27, 1995 |
|
20 |
EPA’s Risk Management Program |
Sept 25-28, 1995 |
|
19 |
Industrial Wastewater Treatment (#2) |
July 26-27, 1995 |
|
18 |
Process Equipment Integrity |
May 3-4, 1995 |
|
17 |
ISO 9000 Quality Assurance Standards |
Nov 17-18, 1994 |
|
16 |
Programmable Controller Applications |
Oct 17-19, 1994 |
|
15 |
Process Safety Management |
June 27-29, 1994 |
|
14 |
Pump Selection: Operation & Maintenance (#2) |
Feb 9-11, 1994 |
|
13 |
NACE Basic
Corrosion Course |
Sept 15-17, 1993 |
|
12 |
Pressure Release Valves/Rupture Discs:Selection-Maintenance |
May 10-12, 1993 |
|
11 |
Machinery Vibration Analysis |
March 2-5, 1993 |
|
10 |
Distributed Process Control Systems (#2) |
Nov 18-20, 1992 |
|
9 |
Environmental Laws for Industry |
Sept 23-25, 1992 |
|
8 |
OSHA Process Safety: Compliance with 29 CFR
1910.119 |
April 29-May 1, 1992 |
|
7 |
Heat Exchangers in the Process Industry (#1) |
Feb 26-28, 1992 |
|
|
Process Simulation: Overview of Hysim |
Nov 7-8, 1991 |
|
6 |
Construction Project Management (From Owner’s
Viewpoint) |
Sept 25-27, 1991 |
|
5 |
Principles of Project Management |
May 1-3, 1991 |
|
4 |
Pump Selection, Operation & Maintenance (#1) |
Feb 25-27, 1991 |
|
3 |
Distributed Process Control Systems |
Nov 7-9, 1990 |
|
2 |
Project Management & Evaluation |
Sept 20-21, 1990 |
|
1 |
Industrial
Wastewater Treatment for the 1990s |
May 3-4, 1990 |
|