|
Phone: 337-475-5874
Fax: 337-475-5286
Box 91735
Lake Charles, LA 70609
engineering@mcneese.edu
http://mcneese.edu/ceet/eng
|
Civil Engineering - CIEN 310
Elementary Surveying
- Classification surveying – plane surveying, geodetic surveying
- Control surveying
- Topographic surveying
- Route surveying
- Bathometric surveying
- Distance measurement
- Pacing
- Measurement by steel tape – errors and correction of measured distance
- Measurement of distance by EDM (Electric Distance Meter)
- Measurement distance by stadia method
- Leveling
- Differential leveling and establishing vertical controls (Bench Marks)
- Profile leveling
- Tangential leveling
- Three point problem
- Reciprocal leveling
- Correction for curvature and refraction
- Measurement of Angles
- Transit
- Theodolite
- Direction of lines – bearing and azimuths
- Compass and local attraction
- Latitude and departure
- Closed traverse measurement
- Adjustment of closed traverse
- Contours
- Computations of areas and volumes
- Earth work calculations – balancing cuts and fills
- Mass diagram
- Declination
- Cartesian coordinates
- Length and direction calculations using coordinates
- Area calculations by coordinates
- Total station
- Establishment of horizontal and vertical control by Total station
- Topographic surveying by Total Station
- Drawing topographic map
- Global Positioning System
- Latitude, Longitude, and altitude
- Local and state coordinates
- Static method of GPS
- RTK (Real Time Kinematic) method of GPS
- Theory of Errors
- Basics of Boundary Surveying
Prepared by Dr. Janardanan Uppot
|