1.0
PURPOSE:
Inspections are used
to detect and eliminate any actual or potential hazards that could lead
to
accidents
or incidents. Inspections
should detect unsafe conditions and unsafe practices with a determination on
appropriate remedial action.
2.0
Frequency
2.1.
Building
inspections should be performed at least once per quarter during the calendar
year.
2.2.
The
Safety Inspection Checklist (Section 7:
Forms) and Hazard Control Form HA-1-90 (Section 7: Forms) should be used to document
any findings.
2.2.1.
A
suggested Laboratory Inspection Checklist may be found in Section 7:
Forms. However, it may be
necessary to utilize a site-specific special inspection checklist based on the
potential hazards in the area.
2.3.
Inspections
by outside agencies such as DEQ, ORM, or the Office of the State Fire Marshal
are conducted at their discretion, or upon request from individuals inside and
outside of the university.
2.0
Responsibility
2.1
Deans
and Department Heads are responsible to assign personnel to assist the building
coordinator with inspections.
2.2
Should
more than one department occupy space in a building, one or more persons may be
assigned to do the inspection. A
team approach is encouraged.
2.3
Departmental
personnel shall perform specific inspections of areas including but not limited
to laboratories, shop areas and studios on a periodic basis.
3.0
Findings
3.1
All
findings should be noted on the checklist and hazard control
log.
3.2
A
copy of the findings should be sent to the appropriate Dean (s) and Department
Head (s).
3.3
Original
building inspection forms will be sent to the EHS/HW Officer for
filing.
3.4
All
other inspection forms will be retained within each originating department.
3.4.1
Inspection
records are subject to review by the Environmental, Health, Safety and Hazardous
Waste Officer.
3.5
Inspectors
who, in the normal course of inspection, find empty extinguishers, leaking
sprinkler heads/valves, broken smoke/heat detectors, etc., shall report same to
Physical Plant personnel immediately for repair or replacement.
4.0
Corrective
Action
4.1
Suggested
corrective action to notated deficiencies should accompany the findings. These may include temporary, as well as
long-term solutions.
4.2
A
copy of the suggested corrective actions should be sent to physical plant
personnel to be turned into work orders for maintenance
personnel.